Piscataway Township, NJ hosts the NJ1 facility, developed and maintained by Dupont Fabros Technology. Completed in 2010, this 360,000 square foot datacenter boasts a critical power load capacity of 36.4 MW. The facility is equipped with 32 Rotary UPS Power systems, each delivering 1,300 kW of critical output, configured with N+2 redundancy to ensure continuous reliability.